Started project development as independent power producer (IPP)
Read moreEntered into engineering procurement construction segment
Entered into engineering procurement construction segment with contract to supply equipment for a 10.062 MWp (installed module capacity) Poly Crystalline Grid Interactive Photovoltaic power plant in the state of Andhra Pradesh.
Read more
Entered into engineering procurement construction segment with contract to supply equipment for a 10.062 MWp (installed module capacity) Poly Crystalline Grid Interactive Photovoltaic power plant in the state of Andhra Pradesh.
Read more